Post 45 Public Scoping Meeting
The Charleston District is responsible for the Post 45 project looking into the economic benefits and environmental acceptibilities of dredging the harbor beyond the current 45 ft depth.

Download Image: Full Size (2.19 MB)
Tags:
Photo by: Dennis Franklin |  VIRIN: 120813-A-ZZ999-151.JPG