Post 45 Ship Simulation
The Charleston District conducted ship simulations at the Engineer Research and Development Center in Vicksburg, Miss. The simulations test the conditions of the current design for the Post 45 harbor deepening project to finalize plans for the future of the harbor.

Download Image: Full Size (2.2 MB)
Tags:
Photo by: Sara Corbett |  VIRIN: 160426-A-IX140-137.JPG