Walls Cast at Pierce Terrace
The Charleston District is using two unique types of concrete wall construction on the new Pierce Terrace Elementary School at Fort Jackson. The District is using insulated concrete form walls and pre-cast concrete panels in an effort to be more efficient and increase durability.

Download Image: Full Size (3.13 MB)
Tags:
Photo by: Dennis Franklin |  VIRIN: 180516-A-EX555-524.JPG