The proposed work consists of the construction of a boat ramp in Main Creek. In detail, the work consists of the placement of 311 cubic yards of material below the High Tide Line (HTL) for the construction of a 14’ x 120’ boat ramp. A docking structure is also proposed at this location; however, the docking structure will be reviewed under Regional General Permit No. SAC-RGP-09. The applicant states, “No mitigation is proposed due to the size and scope of the project”. The project purpose, according to the applicant, is to provide recreational access for the property owner.