SAC-2004-02915

USACE
Published June 21, 2024
Expiration date: 7/5/2024

In detail, the proposed work consists of the addition of six (6) 12.8’ x 6’ EZ dock structures attached to the northernmost floating dock, one (1) 30’ x 6’ dock spacer attached to the northernmost floating dock, and seven (7) 12.8 x 2.25’ dock spacers attached to the northernmost floating dock.

In addition, the applicant is seeking after-the-fact authorization for five (5) 12.8’ x 4.8 EZ dock jet and ski docking structures to be relocated to the western portion of the northernmost floating dock, and eight (8) 12.8’ x 4.8’ EZ dock structures attached to the northernmost floating dock.