Crane Retrofit
The Charleston District is deepening Charleston Harbor to 52 feet. To accommodate the larger ships calling on the Port of Charleston, the Port had to retrofit some of their cranes to be able to unload the cargo.

Download Image: Full Size (3.92 MB)
Tags:
Photo by: Sara Corbett |  VIRIN: 180814-A-IX140-231.JPG