The proposed work consists of completing the reconstruction of a marina due to damage caused by Hurricane Matthew.  The reconstruction of the marina would be completed as previously permitted.  It should be noted that a portion of the marina has previously been reconstructed under a previous, expired authorization.  In addition to the reconstruction, the applicant also currently proposes to expand the previously authorized facility on the east and west side docks.  The east side marina expansion would include the addition of a 100’ x 8’ floating dock on pier 2 and a 100’ x 8’ floating dock on pier 3.  The west side marina expansion would include the addition of a 100’ x 8’ floating dock on pier 1, a 320’ x 8’ floating dock on pier 2, and a 440’ x 8’ floating dock on pier 3.  The proposed expansion would not extend the marina footprint further waterward.  Please see the attached drawing for further detail.