ArticleCS - Article View

SAC-2022-00709

USACE
Published July 22, 2022
Expiration date: 8/5/2022

The proposed work consists of the construction of a new 6-slip public use dock.  In detail, the dock would include 6 finger docks 6’ X 20’ each, on a 130’ wide frame comprised of 4 docks 6’ X 32’ 6” each, held by a total of 6 pile foundations, with a 6’ X 50’ ADA gangway leading to a boat dock plaza and concrete greeneway.