ArticleCS - Article View

SAC-2022-01478

USACE
Published Jan. 18, 2023
Expiration date: 2/1/2023

The proposed work consists of constructing a commercial marina and fishing dock in Lake Marion.  The marina consists of a 6’ x 250’ walkway with ten 4’ x 40’ floating finger docks, a 10’ x 24’ “T” pier head, and a 4’ x 90’ floating dock.  The fishing dock consists of a 6’ x 53’ walkway to a 15’ x 15’ covered pier head to a 10’ x 20’ floating dock.