ArticleCS - Article View

SAC-2021-02108

USACE
Published Oct. 19, 2023
Expiration date: 11/3/2023

The proposed work consists of the construction of two (2) private-use docks and associated dredging.  In detail, the proposed work consists of the construction of two (2) separate docking facilities within Collins Creek.  The first dock consists of a 15’ x 20’ covered fixed pierhead with an adjacent 14’ x 12.5’ covered boatlift which will require dredging 500 cubic yards of material from approximately 2,775 square feet from Collins Creek to depth of -4 feet below mean low water (MLW). Dredging will be completed by a long-arm track hoe stationed within adjacent onsite uplands.  The dredged material will be placed within onsite uplands behind a berm with no outfall structure/return water pipe and therefore will not allow any return water to Collins Creek.  The dredged material will be allowed to dry in place and once dried will be utilized onsite for general site preparation purposes.  The second proposed dock consists of a 15’ x 15’ covered fixed pierhead with an attached 3’ x 16’ gangway leading to a 10’ x 16’ floating dock. In addition, adjacent to the fixed pierhead will be a 12.5’ x 12.5’ covered boatlift.