The proposed work consists of two phases. First, a temporary cofferdam will be placed near the riverward end of the canal to facilitate dewatering of the canal. Silted materials from the canal interior will then be excavated and placed at an upland location on the property. Second, excavation of a minor amount of material on the river side of the cofferdam will occur during a spring low tide event.