The proposed work consists of modifying and expanding an existing commercial dock. The existing structure consists of a 9.4’ x 9.9’ access walkway leading to an 8’ x 59’ fixed pier. The applicant proposes to repair, as needed, the existing walkway and fixed pier as well as remove 96 square feet of the existing fixed pier and adding a new 3’ x 20’ ramp leading ebb side to a new 8’ x 40’ floating dock.