ArticleCS - Article View

SAC-2023-01074

USACE
Published Sept. 10, 2024
Expiration date: 10/9/2024

The proposed work consists of the placement of fill to create suitable high ground within an approximately 313.22 acres site for a new mixed-use development which would include industrial, commercial, medical, and residential development with required road network.  In detail, the project would impact 30.12 acres of wetlands (23.3 acres of fill, 6.82 acres excavated and flooded), 1,547 linear feet of non-wetland waters (1320 linear feet fill, 227 linear feet pipe/culvert), and 0.37 acre of non-wetland open water (fill) for site development, buildings, roads, and storm water management.